MIL-D-63123B(AR)
4.5.6 Humidity. This test shall be performed as specified in
MIL-STD-810C, Test Method 507.1, Procedure I, (10 days). Following
this test, each dispenser assembly shall be examined for evidence of
damage and submitted to the functioning test of 4.5.1.
(Non-Destructive Test)
4.5.7 Burn-in. Each Dispenser Assembly shall be subjected to
testing utilizing the functioning test system and procedures
described in Dwg. 9280367.
4.5.8 Seal inteqrity. Each sequencer assembly (9311443) shall
be placed in a cylindrical air tight chamber with the free space
minimized. The air pressure (moisture free) within the chamber
shall be raised to a minimum of 5 psig by means of a fixed volume of
air. With the air supply shut off the pressure shall be maintained
for 15 seconds min. Any sequencer which fails to attain the minimum
pressure specified or exhibits any leakage in excess of 0.05 psig
shall be class defective and removed from the lot. (Non-Destructive
Test)
5.
PACKAGING
5.1 Preservation and packaqinq.
5.1.1 Level A. Preservation and packaging shall be as
specified on Drawing 9321248 when shipped as a repair part; or
Drawing 9313708 when shipped as part of the M130 Dispenser System.
5.2 Packinq.
5.2.1 Level A. - Packing shall be as specified on Drawing
9321248 when shipped as a repair part; or Drawing 9313708 when
shipped as part of M130 Dispenser System.
5.3 Marking.
5.3.1 Level A. Marking shall be as specified on Drawing
9321248 when shipped as a repair part; or Drawing 9313708 when
shipped as part of M130 Dispenser System.
5.4 Unitization.
5.4.1 Level A. Only when shipped as part of the M130 Dispenser
System, the dispenser assembly in the drum shall be unitized in
accordance with Dwg. 19-48-4138/109-20 PA1000 (DARCOM Ammo Center).
30
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business